Dallas Love Field Modernization Program
Public/Private Partnership – (cost: $ 575 Million, Duration: 2009 – 2014) Provide structural engineering support services (design, non-conformance reports, analysis, research), construction support. Working since December 2009 to 2014.
LBJ Express Managed Lanes Design-Build managed lanes, toll lanes on the LBJ Freeway (US 75 to I-35E), I-35E (I-635 to Loop 12 interchange) in Dallas, Texas. (Cost: $ 2.7 Billion, Duration: 2011 – 2016). Provide design optimization support and technical assistance to the contractor during the project construction phase. Working since April 2011 to 2015.
North Tarrant Express Managed Lanes Design-Build managed lanes, toll lanes on the North Tarrant Expressway (SH183/121 @ DFW Airport to I-35W) in Ft. Worth, Texas. (Cost: $ 2.5 Billion, Duration: 2011 – 2016). Provide design optimization support, utility coordination and technical assistance to the contractor during the project construction phase. Working since April 2011 to 2015.
Sylvan Ave. Bridge Design-Bid-Build bridge in Dallas, Texas. (Cost: $ 100 Million, Duration: 2012 – 2014). Provide design optimization support, design of traffic control. Working since June 2012 to 2015.
Dallas Horse Shoe Mix Master Provide design reviews and QA of all structural bridge designs for the entire project. We are part of the QA team lead by Raba Kistner who is part of the Pegasus Link Constructors team. Working since July 2013 to 2014.
DART Green Line Expansion – CMGC-01
10 miles (Cost $ 465 Million), Provide structural engineering support services (design, non-conformance reports, analysis, research), construction support, Track/Systems construction support. Working since Feb 2008 to Dec 2010.
DART Green Line Expansion – CMGC-03 15 miles (Cost: $ 487 Million) Provide structural engineering support services (design, non-conformance reports, analysis, research), construction support, Track/Systems construction support. Working since Feb 2008 to Dec 2010.
DART Blue Line Extension Design-Build 4.8 miles (Cost: $ 190 Million, Duration: 2009 - 2012) Provide design-construction interface coordination (DCIC) for entire project, QA/QC for construction. Working since Feb 2009 to Dec 2012.
Dallas Independent School District (DISD) 2008 Bond Program (Cost: $ 1.2 Billion, Duration: 2009 – 2012) Provide Civil & Structural design reviews for new & existing school facilities & rehabilitation work. Working since May 2009 to 2012.
NTTA SH 161 Toll Road Project Extension of SH 161 Toll road from I-30 south to I-20 in Tarrant County, Texas. (Cost: $ 420 Million, Duration: 2010 – 2012). Provide Quality Acceptance (QA) services representing NTTA, for the construction of toll road. Working since June 2010 to Dec 2012.
|